Skeffling Village Hall. 6kW turbine on 15m mast – installed February 2007.
The Turbine has performed very well over the past year. It hasn’t broken any records but on the other hand it has fulfilled its function and provided all the power required in the Village Hall and then some. The proceeds from the surplus has been invested for future maintenance and eventual replacement.
The Turbine has performed very well over the past year. It hasn’t broken any records but on the other hand it has fulfilled its function and provided all the power required in the Village Hall and then some. The proceeds from the surplus has been invested for future maintenance and eventual replacement.

Bowland Wild Boar Park. 6kW turbine on 15m mast – installed February 07.This is a very popular tourist attraction in the Forest of Bowland. The site has a cafĂ©, visitor centre and schoolrooms. It has no connection to the National Grid and is totally dependent on the 6kW Proven turbine and solar panels and backup diesel generator. The system guarantees freedom from power cuts the can cope with heavy demand without resorting to backup.