Our interest in alternative sources of energy
began in early 1990 when we purchased Greave Head Farm. The
astronomical cost of connecting to the National Grid
influenced our decision to look at alternatives.
After a disastrous first attempt with a turbine imported from
America, and a whole year lost, we spotted what must at
that time have been one of Proven Energy's very early
machines. We ordered one immediately.
The 2.2 kW machine was delivered by Gordon and
Susanne Proven one evening in 1991. The turbine was up and
running in a few days and we have not had a power cut since!
Eventually we replaced the 2.2 kW turbine with the Proven 6
and over the years have developed controls so that any excess
energy is used to heat the building. This reliable and
extremely efficient system has been replicated and installed
in dozens of off-grid homes and farms.
New technology, in particular the latest inverters such as the
SMA Sunny Island, allows the freedom to position the turbine
further away from buildings and other obstructions to take
best advantage of a cleaner wind without the cost of large
diameter cables.