Telephone: 01422 823360 Fax: 01422 823623 Email: info@eaglepower.co.uk

Skeffling Village Hall
6kW turbine on 15m mast. Installed February 2007 to provide power for the village hall. It was Proven's 1000th turbine.

York EcoDepot. 15kW turbine on 15m mast - installed September 2007.
The multi award-winning York EcoDepot is an exciting demonstration of a
sustainable development that has been designed to deliver a low carbon
footprint. This is the depot for the Neighbourhood Services directorate, the
EcoDepot is highly water and energy efficient. The site incorporates
renewable energy and rain water harvesting.

 

 

 

Meadowfield Primary School
The school wind turbine was officially opened by the Right Honourable Hilary Benn MP, the local Member of Parliament.

Home

Thinking of Investing
in a Wind Turbine

How a Turbine Works

Next Steps

Products

Case Studies

News

Enquiry

Links

Bowland Wild Boar Park
The site has no connection to the national grid and is totally dependant on the 6kW Proven turbine and solar panels.
Follow us on
For more Case Studies