Telephone: 01422 823360 Fax: 01422 823623 Email: info@eaglepower.co.uk

Meadowfield Primary School
The school wind turbine was officially opened by the Right Honourable Hilary Benn MP, the local Member of Parliament.

Skeffling Village Hall. 6kW turbine on 15m mast - installed February 2007.
The Turbine has performed very well over the past year. It hasn't broken
any records but on the other hand it has fulfilled its function and provided
all the power required in the Village Hall and then some. The proceeds
from the surplus has been invested for future maintenance and eventual
replacement.

 

 

Bowland Wild Boar Park
The site has no connection to the national grid and is totally dependant on the 6kW Proven turbine and solar panels.

Home

Thinking of Investing
in a Wind Turbine

How a Turbine Works

Next Steps

Products

Case Studies

News

Enquiry

Links

City of York EcoDepot
The multi award-winning York EcoDepot is an exciting demonstration that has been designed to deliver a low carbon footprint.
Follow us on
For more Case Studies